-13%
Komatsu Dozer D155AXI-8 Field Assembly Instruction
PRECAUTIONS FOR FIELD ASSEMBLY
DISPOSAL OF REMOVED PARTS
ASSEMBLY PROCEDURE, NECESSARY EQUIPMENT, AND SCHEDULE
LAYOUT OF —
STYLE FOR TRANSPORTATION
LIST OF TOOLS FOR FIELD ASSEMBLING–
SKETCH OF JIGS
TIGHTENING TORQUE
COATING MATERIALS LIST.
SELECTION OF WIRE ROPES USED FOR ASSEMBLY —
A. Asæmbly….
A-2.
A-3.
A-S.
A-6.
A-8.
A-9.
Unloading and installing tractor
Installation of trunnion .
Installation of blade lift cylinder…
Awembly of blade
Installation of full roller
Installation of blade……. — —
Installation of ripper
Check of oil and ca•lant levels —
Lubricating
A_IO.
A_ll.
A-12.
A-13.
A-14.
A-IS.
Bleeding air frorn hydraulic cylinders_
Installation of platform
Installation of radio antenna — —
Installation of radio device (other than North America) _ _
Installation of additional working _
Installation of fire extinguisher
M. CHECK AND MAINTENANCE PROCEDURES AFTER COMPLETION OF ASSEMBLY
WI.
M-2.
M-3.
MS.
Replacement of return filter (Standard filter to flushing —
Flushing of hydraulic circuit, and bleeding air from hydraulic cyinders (Part 1) .
Replacement of retum filter (Flushing filterto standard filter)
Bleeding airfrom hydraulic cylinders (Part 2)
Emor ccde
CALIBRATION OF CUTTING EDGE
SERIAL NUMBERS 100040 and up
Komatsu Dozer D155AXI-8 Field Assembly Instruction
Komatsu Dozer D155AXI-8 Field Assembly Instruction