-13%
Komatsu HM400-3EM0 Field Assembly Instruction
Contents
1. Drawings of removed units
2. Dimensions of removed units
3. Assembly procedure, necessary equipments, and schedule
4. Necessary tools and equipments
5. Assembly procedure No.
0010 Installation of the sling
0100 Positioning bare machine
0200 Unfolding of rear view mirror
0210 Installation of left guard
0500 Installation of antenna
Adjusting N2 gas of front and rear suspensions
Attached sheet: Mirror adjustment procedure
Attached sheet: Mirror adjustment procedure (WIDE)
Appendix: Field assembly inspection report
Komatsu HM 400-3 EM0 Field Assembly Instruction
GEN00125-OO
SERIAL NUMBERS
5001
and up