-13%
HYDRAULIC EXCAVATOR PC4000-6 (8172 and up) Shop Manual
MAIN MENU
COVER
CONTENTS
TABLE OF CONTENTS
SAFETY
FOREWARD
HOISTING INSTRUCTIONS
STANDARD TIGHTENING TORQUE
CONVERSION TABLE
1.0 MAIN ASSEMBLY GROUPS
1.0 MAIN ASSEMBLY GROUPS – GENERAL LAY OUT
2.0 PRIME DRIVE ASSEMBLY
2.0 PRIME DRIVE ASSEMBLY – GENERAL LAY OUT
2.1 ENGINE AND PTO MOUNT
2.2 COUPLING
2.3 AIR FILTER
2.4 FAN DRIVE AND RADIATOR ASSEMBLY
2.5 RADIATOR FAN DRIVE SPEED ADJUSTMENT
2.6 PUMP DISTRIBUTOR GEARBOX (PTO)
2.7 PUMP-SPLINE LUBRICATION
2.8 PTO LUBRICATION AND COOLING
2.9 HYDRAULIC PUMPS – LOCATION, DRIVE SPEED AND FLOW RATES
3.0 HYDRAULIC OIL RESERVOIR
3.0 HYDRAULIC OIL RESERVOIR GENERAL LAYOUT
3.1 MAIN OIL TANK, LOCATION OF SWITCHES, SENSORS ETC
3.2 SUCTION OIL TANK WITH STRAINERS
3.3 RETURN OIL COLLECTOR TUBE WITH STRAINER
3.4 BACK PRESSURE VALVE
3.5 TRANSFER PUMP (OPTIONAL EQUIPMENT)
3.6 RETURN AND LEAK OIL FILTER
3.7 BREATHER FILTER
4.0 HYDRAULIC OIL COOLING
4.1 GENERAL
4.2 FUNCTION OF THE HYDRAULIC OIL COOLING CIRCUIT
4.3 ADJUSTMENT OF THE BACK PRESSURE VALVE
4.4 FAN DRIVE (TWO STAGE COOLER FAN PRM CONTROL)
4.5 PRESSURE RELIEF VALVES AND SOLENOID VALVE
4.6 FIXED DISPLACEMENT PUMP, WITH VARIABLE SETTING
5.0 CONTROLLING
5.0 GENERAL LAYOUT – LEGEND FOR ILLUSTRATIONS
5.1 CONTROL AND FILTER PANEL LOCATION OF COMPONENTS (VALVES, SWITCHES, SENSORS ETC)
5.2 PILOT PRESSURE SUPPLY AND ADJUSTMENTS
5.3 REMOTE CONTROL VALVES ARRANGEMENT
5.4 FUNCTION PRINCIPLEOF THE ELECTRO-HYDRAULIC-PROPORTIONAL CONTROL
5.5 POTENTIOMETER CONTROL (LEVER, JOY STICK)
5.6 POTENTIOMETER CONTROL (PEDAL)
5.7 PROPORTIONAL AMPLIFIER MODULE, TYPE A
5.8 PROPORTIONAL AMPLIFIER MODULE, TYPE B
5.9 RAMP TIME MODULE
5.10 ADJUSTMENTS OF AMPLIFIER MODULES (GENERAL)
5.11 ADJUSTING THE AMPLIFIERS TYPE B, ILLUSTRATION
5.12 ADJUSTING THE AMPLIFIERS TYPE B, ILLUSTRATION
5.13 ADJUSTING THE RAMP TIME MODULE
6.0 COMPONENTS
6.1 HYDRAULIC
7.0 MAIN HYDRAULIC PUMPS AND PUMP REGULATION SYSTEM
7.0 GENERAL LAYOUT (HYDRAULIC ONLY)
7.0 GENERAL LAYOUG (PUMP REGULATION SYSTEM)
7.1 MAIN PUMPS
7.2 ELECTRONIC PUMP REGULATION SYSTEM
7.3 HYDRAULIC CONSTANT REGULATION SYSTEM
7.4 DETERMINATION OF THE PEAK POINT (ENGINE PERFORMANCE)
8.0 OPERATING HYDRAULIC
OPERATING HYDRAULIC – GENERAL
9.0 HYDRAULIC TRACK TENSIONING SYSTEM
9.0 GENERAL
9.1 FUNCTIONAL DESCRIPTION
9.2 PRESSURE INCREASING VALVE
9.3 TENSIONING CYLINDER
9.4 ADJUSTMENTS / CHECKS
9.5 FUNCTIONAL TEST
10.0 ACCESS LADDER HYDRAULIC OPERAGED
10.0 GENERAL
10.1 FUNCTION OF HYDRAULIC OPERATED ACCESS LADDER
11.0 HYDRAULIC OPERATED REFILLING ARM
11.0 GENERAL
11.1 FUNCTION OF HYDRAULIC OPERATED REFILLING ARM
12.0 HINTS FOR READING THE HYDRAULIC CIRCUIT DIAGRAM
12.0 GENERAL
12.1 LEGEND FOR THE CIRCUIT DIAGRAM
12.2 HOW TO READ THE CIRCUIT DIAGRAM
13.0 HINTS FOR READING THE ELECTRIC CIRCUIT DIAGRAM
13.1 DESIGNATION OF ELECTRICAL DEVICES
13.2 SYMBOLS
13.3 GENERAL INFORMATION
13.4 READING A CIRCUIT DIAGRAM
13.5 COMPONENT LIST
14.0 VEHICLE HEALTH MONITORING SYSTEM
DATA FLOW CONTROL OF VHMS
GENERAL
14.1 COLORED GRAPHIC CONSOLE (CGC) SPECS FOR OPERATORS
14.2 COLORED GRAPHIC CONSOLE (CGC) SPECS FOR SERVICEMEN
14.4 WIRING OF THE MAIN COMPONENTS
15.0 LUBRICATION SYSTEMS
15.1 HYDRAULICALLY DRIVEN LUBE PUMP
15.2 ONE LINE SYSTEM WITH HYDRAULICALLY DRIVEN “PUMP MASTER III” PUMP
15.3 PINION TYPE SYSTEM WITH HYDRAULIC DRIVEN “POWER MASTER III” PUMP
15.4 COMPONENTS
FLOWCHART 942 107 40
FLOWCHART 942 107 40 PAGE 1 OF 70
FLOWCHART 942 107 40 PAGE 2 OF 70
FLOWCHART 942 107 40 PAGE 3 OF 70
FLOWCHART 942 107 40 PAGE 4 OF 70
FLOWCHART 942 107 40 PAGE 5 OF 70
FLOWCHART 942 107 40 PAGE 6 OF 70
FLOWCHART 942 107 40 PAGE 7 OF 70
FLOWCHART 942 107 40 PAGE 8 OF 70
FLOWCHART 942 107 40 PAGE 9 OF 70
FLOWCHART 942 107 40 PAGE 10 OF 70
FLOWCHART 942 107 40 PAGE 11 OF 70
FLOWCHART 942 107 40 PAGE 12 OF 70
FLOWCHART 942 107 40 PAGE 13 OF 70
FLOWCHART 942 107 40 PAGE 14 OF 70
FLOWCHART 942 107 40 PAGE 15 OF 70
FLOWCHART 942 107 40 PAGE 16 OF 70
FLOWCHART 942 107 40 PAGE 17 OF 70
FLOWCHART 942 107 40 PAGE 18 OF 70
FLOWCHART 942 107 40 PAGE 19 OF 70
FLOWCHART 942 107 40 PAGE 20 OF 70
FLOWCHART 942 107 40 PAGE 21 OF 70
FLOWCHART 942 107 40 PAGE 22 OF 70
FLOWCHART 942 107 40 PAGE 23 OF 70
FLOWCHART 942 107 40 PAGE 24 OF 70
FLOWCHART 942 107 40 PAGE 25 OF 70
FLOWCHART 942 107 40 PAGE 26 OF 70
FLOWCHART 942 107 40 PAGE 27 OF 70
FLOWCHART 942 107 40 PAGE 28 OF 70
FLOWCHART 942 107 40 PAGE 29 OF 70
FLOWCHART 942 107 40 PAGE 30 OF 70
FLOWCHART 942 107 40 PAGE 31 OF 70
FLOWCHART 942 107 40 PAGE 32 OF 70
FLOWCHART 942 107 40 PAGE 33 OF 70
FLOWCHART 942 107 40 PAGE 34 OF 70
FLOWCHART 942 107 40 PAGE 35 OF 70
FLOWCHART 942 107 40 PAGE 36 OF 70
FLOWCHART 942 107 40 PAGE 37 OF 70
FLOWCHART 942 107 40 PAGE 38 OF 70
FLOWCHART 942 107 40 PAGE 39 OF 70
FLOWCHART 942 107 40 PAGE 40 OF 70
FLOWCHART 942 107 40 PAGE 41 OF 70
FLOWCHART 942 107 40 PAGE 42 OF 70
FLOWCHART 942 107 40 PAGE 43 OF 70
FLOWCHART 942 107 40 PAGE 44 OF 70
FLOWCHART 942 107 40 PAGE 45 OF 70
FLOWCHART 942 107 40 PAGE 46 OF 70
FLOWCHART 942 107 40 PAGE 47 OF 70
FLOWCHART 942 107 40 PAGE 48 OF 70
FLOWCHART 942 107 40 PAGE 49 OF 70
FLOWCHART 942 107 40 PAGE 50 OF 70
FLOWCHART 942 107 40 PAGE 51 OF 70
FLOWCHART 942 107 40 PAGE 52 OF 70
FLOWCHART 942 107 40 PAGE 53 OF 70
FLOWCHART 942 107 40 PAGE 54 OF 70
FLOWCHART 942 107 40 PAGE 55 OF 70
FLOWCHART 942 107 40 PAGE 56 OF 70
FLOWCHART 942 107 40 PAGE 57 OF 70
FLOWCHART 942 107 40 PAGE 58 OF 70
FLOWCHART 942 107 40 PAGE 59 OF 70
FLOWCHART 942 107 40 PAGE 60 OF 70
FLOWCHART 942 107 40 PAGE 61 OF 70
FLOWCHART 942 107 40 PAGE 62 OF 70
FLOWCHART 942 107 40 PAGE 63 OF 70
FLOWCHART 942 107 40 PAGE 64 OF 70
FLOWCHART 942 107 40 PAGE 65 OF 70
FLOWCHART 942 107 40 PAGE 66 OF 70
FLOWCHART 942 107 40 PAGE 67 OF 70
FLOWCHART 942 107 40 PAGE 68 OF 70
FLOWCHART 942 107 40 PAGE 69 OF 70
FLOWCHART 942 107 40 PAGE 70 OF 70
HYDRAULIC PLAN 942 105 40
HYDRAULIC PLAN 942 105 40 PAGE 1 OF 9
HYDRAULIC PLAN 942 105 40 PAGE 2 OF 9
HYDRAULIC PLAN 942 105 40 PAGE 3 OF 9
HYDRAULIC PLAN 942 105 40 PAGE 4 OF 9
HYDRAULIC PLAN 942 105 40 PAGE 5 OF 9
HYDRAULIC PLAN 942 105 40 PAGE 6 OF 9
HYDRAULIC PLAN 942 105 40 PAGE 7 OF 9
HYDRAULIC PLAN 942 105 40 PAGE 8 OF 9
HYDRAULIC PLAN 942 105 40 PAGE 9 OF 9
ELECTRICAL PLAN 942 106 40
ELECTRICAL PLAN 942 106 40 PAGE 1 OF 73
ELECTRICAL PLAN 942 106 40 PAGE 2 OF 73
ELECTRICAL PLAN 942 106 40 PAGE 3 OF 73
ELECTRICAL PLAN 942 106 40 PAGE 4 OF 73
ELECTRICAL PLAN 942 106 40 PAGE 5 OF 73
ELECTRICAL PLAN 942 106 40 PAGE 6 OF 73
ELECTRICAL PLAN 942 106 40 PAGE 7 OF 73
ELECTRICAL PLAN 942 106 40 PAGE 8 OF 73
ELECTRICAL PLAN 942 106 40 PAGE 9 OF 73
ELECTRICAL PLAN 942 106 40 PAGE 10 OF 73
ELECTRICAL PLAN 942 106 40 PAGE 11 OF 73
ELECTRICAL PLAN 942 106 40 PAGE 12 OF 73
ELECTRICAL PLAN 942 106 40 PAGE 13 OF 73
ELECTRICAL PLAN 942 106 40 PAGE 14 OF 73
ELECTRICAL PLAN 942 106 40 PAGE 15 OF 73
ELECTRICAL PLAN 942 106 40 PAGE 16 OF 73
ELECTRICAL PLAN 942 106 40 PAGE 17 OF 73
ELECTRICAL PLAN 942 106 40 PAGE 18 OF 73
ELECTRICAL PLAN 942 106 40 PAGE 19 OF 73
ELECTRICAL PLAN 942 106 40 PAGE 20 OF 73
ELECTRICAL PLAN 942 106 40 PAGE 21 OF 73
ELECTRICAL PLAN 942 106 40 PAGE 22 OF 73
ELECTRICAL PLAN 942 106 40 PAGE 23 OF 73
ELECTRICAL PLAN 942 106 40 PAGE 24 OF 73
ELECTRICAL PLAN 942 106 40 PAGE 25 OF 73
ELECTRICAL PLAN 942 106 40 PAGE 26 OF 73
ELECTRICAL PLAN 942 106 40 PAGE 27 OF 73
ELECTRICAL PLAN 942 106 40 PAGE 28 OF 73
ELECTRICAL PLAN 942 106 40 PAGE 29 OF 73
ELECTRICAL PLAN 942 106 40 PAGE 30 OF 73
ELECTRICAL PLAN 942 106 40 PAGE 31 OF 73
ELECTRICAL PLAN 942 106 40 PAGE 32 OF 73
ELECTRICAL PLAN 942 106 40 PAGE 33 OF 73
ELECTRICAL PLAN 942 106 40 PAGE 34 OF 73
ELECTRICAL PLAN 942 106 40 PAGE 35 OF 73
ELECTRICAL PLAN 942 106 40 PAGE 36 OF 73
ELECTRICAL PLAN 942 106 40 PAGE 37 OF 73
ELECTRICAL PLAN 942 106 40 PAGE 38 OF 73
ELECTRICAL PLAN 942 106 40 PAGE 39 OF 73
ELECTRICAL PLAN 942 106 40 PAGE 40 OF 73
ELECTRICAL PLAN 942 106 40 PAGE 41 OF 73
ELECTRICAL PLAN 942 106 40 PAGE 42 OF 73
ELECTRICAL PLAN 942 106 40 PAGE 43 OF 73
ELECTRICAL PLAN 942 106 40 PAGE 44 OF 73
ELECTRICAL PLAN 942 106 40 PAGE 45 OF 73
ELECTRICAL PLAN 942 106 40 PAGE 46 OF 73
ELECTRICAL PLAN 942 106 40 PAGE 47 OF 73
ELECTRICAL PLAN 942 106 40 PAGE 48 OF 73
ELECTRICAL PLAN 942 106 40 PAGE 49 OF 73
ELECTRICAL PLAN 942 106 40 PAGE 50 OF 73
ELECTRICAL PLAN 942 106 40 PAGE 51 OF 73
ELECTRICAL PLAN 942 106 40 PAGE 52 OF 73
ELECTRICAL PLAN 942 106 40 PAGE 53 OF 73
ELECTRICAL PLAN 942 106 40 PAGE 54 OF 73
ELECTRICAL PLAN 942 106 40 PAGE 55 OF 73
ELECTRICAL PLAN 942 106 40 PAGE 56 OF 73
ELECTRICAL PLAN 942 106 40 PAGE 57 OF 73
ELECTRICAL PLAN 942 106 40 PAGE 58 OF 73
ELECTRICAL PLAN 942 106 40 PAGE 59 OF 73
ELECTRICAL PLAN 942 106 40 PAGE 60 OF 73
ELECTRICAL PLAN 942 106 40 PAGE 61 OF 73
ELECTRICAL PLAN 942 106 40 PAGE 62 OF 73
ELECTRICAL PLAN 942 106 40 PAGE 64 OF 73
ELECTRICAL PLAN 942 106 40 PAGE 63 OF 73
ELECTRICAL PLAN 942 106 40 PAGE 65 OF 73
ELECTRICAL PLAN 942 106 40 PAGE 67 OF 73
ELECTRICAL PLAN 942 106 40 PAGE 66 OF 73
ELECTRICAL PLAN 942 106 40 PAGE 68 OF 73
ELECTRICAL PLAN 942 106 40 PAGE 69 OF 73
ELECTRICAL PLAN 942 106 40 PAGE 71 OF 73
ELECTRICAL PLAN 942 106 40 PAGE 70 OF 73
ELECTRICAL PLAN 942 106 40 PAGE 72 OF 73
ELECTRICAL PLAN 942 106 40 PAGE 73 OF 73