-13%
HYDRAULIC EXCAVATOR PC8000E-6 Assembly and Transport Manual
2 SAFETY
2.1 SAFETY INFORMATION
2.2 OVERVIEW
2.3 SOUND PRESSURE LEVEL IN THE OPERATOR’S CAB.
2.4 GENERAL PRECAUTIONS COMMON TO OPERATION ON THE EXCAVATOR
2.5 PRECAUTION FOR MAINTENANCE
2.6 ADDITIONAL SAFETY INFORMATION FOR TROUBLESHOOTING AND ADJUSTMENTS
2.7 SPECIAL SAFETY EQUIPMENT
2.8 ADDITIONAL SAFETY PRECAUTIONS
3 GENERAL
3.1 GENERAL
3.2 ASSEMBLY SITE REQUIREMENTS
3.3 LIFTING OF THE MAIN COMPONENTS
3.4 GENERAL INSTALLATION PROCEDURES FOR HYDRAULIC HOSE LINES
4 ASSEMBLY SEQUENCE
4.1 ASSEMBLY SEQUENCE OF FACE SHOVEL MACHINES
4.2 ASSEMBLY SEQUENCE OF BACKHOE MACHINES
4.3 ASSEMBLY OF UNDERCARRIAGE
4.4 MOUNTING OF THE CABLE DRUM
4.5 MOUNTING OF THE CABLE GUIDE
4.6 MOUNTING OF THE SWING CIRCLE
4.7 MOUNTING SUPERSTRUCTURE PLATFORM ONTO UNDERCARRIAGE
4.8 CONNECTING HYDRAULIC LINES TO THE ROTARY JOINT
4.9 MOUNTING MACHINERY HOUSE ONTO THE SUPERSTRUCTURE PLATFORM
4.10 MOUNTING OF THE REAR ACCESS LADDER
4.11 MOUNTING OF THE LATERAL ACCESS LADDER
4.12 PRE-ASSEMBLY OF FACE SHOVEL BOOM
4.13 ATTACH BOOM TO SUPERSTRUCTRE A-FRAME
4.14 PRE-ASSEMBLY OF BACKHOE BOOM
4.15 MOUNTING OF THE COUNTERWEIGHT
4.16 MOUNTING OF THE HIGH VOLTAGE CABINET
4.17 HIGH VOLTAGE INTERLOCK SAFETY SWITCHES
4.18 CONNECT HIGH VOLTAGE CABLES AND CONTROL CABLES ON MACHINES WITH CABLE DRUM
4.19 CONNECT HIGH VOLTAGE CABLES ON MACHINES WITH CABLE GUIDE
4.20 MOUNTING OF THE CAB BASE
4.21 ATTACHING THE CAB WITH SUPPORT FRAME TO THE CAB BASE
4.22 MOUNTING OF FRONT ROOF AND COVERING
4.23 ATTACHING THE HYDRAULIC OIL RESERVOIR
4.24 ATTACHING THE HYDRAULIC OIL COOLER
4.25 ATTACHING THE HANDRAILS, CATWALKS AND STEPS
4.26 ATTACHING THE CENTRAL LUBRICATION UNIT
4.27 CENTRAL REFILLING SYSTEM
4.28 MOUNTING CAN-NODE BOXES ON MACHINERY HOUSE ROOF
4.29 ATTACHING THE SERVICE CRANE (IF SO EQUIPPED)
4.30 PRE-CHECKS PRIOR TO INITIAL START UP
4.31 HIGH VOLTAGE INTERLOCK SYSTEM
4.32 CHECKING DIRECTION OF MOTOR ROTATION
4.33 CHECK AND ADJUST ALIGNMENT OF MAIN MOTORS
4.34 FILLING AND BLEEDING THE HYDRAULIC SYSTEM
4.35 BLEEDING GEAR PUMPS FOR PTO GEAR LUBRICATION
4.36 ASSEMBLY FACE SHOVEL ATTACHMENT
4.37 BLEEDING THE HYDRAULIC CIRCUITS
4.38 ATTACHING FACE SHOVEL TO THE STICK
4.39 ATTACHING THE BACKHOE STICK TO THE BOOM
4.40 BLEEDING THE HYDRAULIC CIRCUITS
4.41 ATTACHING BACKHOE BUCKET TO THE STICK
4.42 BLEEDING HYDRAULIC CIRCUITS OF THE TRAVEL MOTORS
5 FINAL CHECKS AND ADJUSTMENTS
5.0.1 COMMISSIONING CHECK LIST
5.0.2 ADJUSTMENT OF AUTOMATIC LUBRICATION SYSTEMS
5.0.3 MAIN PUMP ADJUSTMENT IN RELATION TO ALTITUDE AT THE MINE SITE
5.0.4 PRESSURE COMPENSATION OF SEALED COMPONENTS
5.1 FINAL ADJUSTMENT OF SLEW ANGLE WARNING SYSTEM
5.2 PLACING THE FIRE DETECTION AND SUPPRESSION SYSTEM IN SERVICE
5.3 COMMISSIONING OF THE AIR CONDITIONING
5.4 PERFORM THE PM-CLINIC PROCEDURE ACCORDING TO THE PM-CLINIC MANUAL
5.5 HANDLING OF DOCUMENTATION AFTER ASSEMBLY AND COMMISSIONING
6 ORBCOMM INITIALIZATION
6.1 ORBCOMM TERMINAL ACTIVATION
6.2 WEBCARE BASIC INFORMATION FOR MACHINE REGISTRATION
7 DISASSEMBLY OF THE MACHINE
7.1 SAFETY PRECAUTIONS FOR DISASSEMBLING THE MACHINE
7.2 GROUNDING PROCEDURE OF THE HIGH VOLTAGE SYSTEM ON MACHINES WITH CABLE DRUM
7.3 GROUNDING PROCEDURE OF THE HIGH VOLTAGE SYSTEM ON MACHINES WITH CABLE GUIDE
8 LIFTING AND TRANSPORTATION OF MAIN COMPONENTS
8.1 LIFTING OF THE MAIN COMPONENTS
8.2 TRANSPORTATION OF THE MAIN COMPONENTS