-13%
Komatsu Crusher BR550JG-1 Shop Manual
SPECIFICATIONS
PRECAUTIONS FOR FIELD ASSEMBLY
OUTLINE OF WORK PROCESS
KIT LAYOUT DRAWING
PACKING POSTURE FOR TRANSPORTATION
NECESSARY TOOLS
TIGHTENING TORQUE
COATING MATERIALS
LIST OF SEPARATELY SHIPPED PARTS
(MACHINE BODY RELATED PARTS)
(WORK EQUIPMENT RELATED
PARTS WHICH NEED NOT TO BE ASSEMBLED
(STORE THEM IN THE TOOL BOX)
A. ASSEMBLY PROCEDURE
Disassembly and assembly procedures
Assembly of the crusher ass’y
Installation of the crusher motor
Installation of the conveyor lock cylinder
Installation of the guard ass’y
Installation of the dust cover plate ass’y and the cover
Installation of the bracket
Installation of the hopper
Installation of the pre-cleaner ass’y
Installation of the muffler.
A-IO Installation of the revolving waming lamp and mirror ass’y
A-II Installation of the revolving waming lamp connector
A-12 Installation ofthe hood ass’y
A-13 Installation of the handrail ass’y
A-14 Installation of the step
A-15 Check of oil and coolant level in each part
A-16 Air bleeding from hydraulic circuits.
B. OPEN-CLOSE HOPPER RELATED PARTS.
PACKING POSTURE FOR TRANSPORTATION
(OPEN-CLOSE HOPPER RELATED PARTS)
LIST OF SEPARATELY SHIPPED PARTS
Installation of the cylinders (bottom side)
Installation of the locks
Installation of the supports
Installation of the hopper
Installation of the cylinders (rod side)
Connection of the switch
Installation of the rubber cover ass’y
Installation of conveyor protection plate (if equipped)
Posture of open-close type hopper
FIELD ASSEMBLY INSPECTION REPORT
GEN00030-02
SERIAL NUMBERS
BR550JG-1001
and up