-13%
Komatsu Crusher BR580JG-1 (GEN00064-01) Shop Manual
COVER
PREFACE
CONTENTS
SPECIFICATIONS
PRECAUTIONS FOR FIELD ASSEMBLY
OUTLINE OF WORK PROCESS
FLOW OF ASSEMBLY PROCEDURE
KIT LAYOUT DRAWING
PACKING POSTURE FOR TRANSPORTATION
LIST OF TOOLS FOR FIELD ASSEMBLING
TIGHTENING TORQUE
COATING MATERIALS LIST
LIST OF SEPARATELY SHIPPED PARTS
A. ASSEMBLY PROCEDURE
A- 1. PREPARATION FOR INSTALLATION OF CRUSHER ASSEMBLY
A- 2. INSTALLATION OF CRUSHER ASSEMBLY
A- 3. INSTALLATION OF STEPS
A- 4. INSTALLATION OF HANDRAILS
A- 5. INSTALLATION OF FLOOR
A- 6. INSTALLATION OF CRUSHER MOTOR HOSES
A- 7. INSTALLATION OF LOCK CYLINDER HOSES
A- 8. INSTALLATION OF CRUSHER WIRING
A- 9. INSTALLATION OF CRUSHER COVERS
A-IO. INSTALLATION OF GUARD ASSEMBLY
A-11. INSTALLATION OF DUST PLATE ASSEMBLY
A-12. INSTALLATION OF SECOND CHUTES
A-13. INSTALLATION OF FEEDER MOTOR
-14. POSTURE OF OPEN/CLOSE HOPPER
A-15. INSTALLATION OF HOPPER (R.H.)
A-16. INSTALLATION OF HOPPER (L.H.)
A-17. INSTALLATION OF HOPPER (REAR)
A-18. INSTALLATION OF HOPPER PINS
A-19. TIGHTENING OF HOPPER MOUNTING BOLTS
A-20. GREASING OF HOPPER
A-21. INSTALLATION OF FIXED HOPPER (IF EQUIPPED)
A-22. INSTALLATION OF CONVEYOR
A-23. INSTALLATION OF CONVEYOR PIPING
A-24. POSTURE OF CONVEYOR
GEN00064-01
SERIAL NUMBERS
1001
and up