BW 135 AD-5 Operating Maintenance Instruction
BW 135 AD-5 Operating Maintenance Instruction Original price was: $30.00.Current price is: $20.00.
Back to products
BW 164AD INSTRUCTION FOR REPAIR
BW 164AD INSTRUCTION FOR REPAIR Original price was: $40.00.Current price is: $30.00.

BW 202 AD-5 Operating Maintenance Instruction

Tandem Vibratory Roller BW 202 AD-5 Operating Maintenance Instruction

Format: PDF

Serial Number: SN 101 921 11 1001

Catalogue Number: 008 200 77

Language: EN

Size: 8.18 MB

Pages: 208

Speed Download Link

Original price was: $30.00.Current price is: $20.00.

Description

Tandem Vibratory Roller BW 202 AD-5 Operating Maintenance Instruction

The BW 202 AD-5 is a versatile and reliable compactor used in various construction and road maintenance projects. To ensure the machine’s smooth operation and longevity, proper operating and maintenance practices are crucial. The BW 202 AD-5 Operating Maintenance Instruction is a comprehensive guide designed to equip operators and technicians with valuable knowledge on technical data, engine functionality, circuit diagrams, drum operation, hydraulic systems, and electric components.

  1. Technical Data: The BW 202 AD-5 Operating Maintenance Instruction starts by presenting essential technical data related to the compactor. This includes specifications like operating weight, compaction width, and engine power. Understanding these parameters is vital for operators to optimize the compactor’s performance based on specific job requirements.
  2. Engine Functionality: The engine is the heart of the BW 202 AD-5 compactor, and proper understanding of its functionality is paramount. The instruction guide covers engine maintenance practices, such as regular inspections, oil and filter changes, and troubleshooting common engine-related issues. With this knowledge, operators can ensure the engine operates efficiently and reliably.
  3. Circuit Diagrams: The BW 202 AD-5 relies on a sophisticated electrical system to control its various functions effectively. The instruction guide provides detailed circuit diagrams, allowing technicians to identify and resolve electrical problems efficiently, minimizing downtime and maximizing productivity.
  4. Drum Operation: The drum is a crucial component responsible for compacting materials efficiently. The instruction guide offers insights into drum functionality, including best practices for achieving desired compaction results and regular maintenance techniques to extend the drum’s lifespan.

In conclusion, the BW 202 AD-5 Operating is a valuable resource for operators and technicians aiming to optimize the performance of this compactor. By mastering technical data, engine functionality, circuit diagrams, drum operation, hydraulic systems, and electric components, operators can ensure the BW 202 AD-5 operates at its best capacity, delivering exceptional compaction results.

BOMAG