



Format: PDF
Language: EN
File Size: 8.58 MB
Pages: 77
Printable Content
$40.00 Original price was: $40.00.$35.00Current price is: $35.00.
SPECIFICATIONS — — —
PRECAUTIONS FOR FIELD ASSEMBLY…….. .
ASSEMBLY PROCEDURE, NECESSARY EQUIPMENT, AND SCHEDULE
STYLE FOR TRANSPOTATION ,
TOOLS LIST FOR FIELD ASSEMBLY „
TIGHTENING TORQUE —
COATING MATERIALS
ASSEMBLY PROtnURE
A-I . Installing track shoes
A-2 . Assembly of blade
3 Installation Of blade
A. 4, Installing ripper .
A- 5. Installation of operator•s cab
A. 6. Installation of BOPS
A- 7, Check track tension
A. 8. fuel, coolant and lubricants
A- 9. Lubricating ………………„
A-10. Bleeding air from hydraulic cylinders
M. CHECK AND MAINTENANCE PROCEDURES AFTER COMPLETION OF ASSEMBLY .
M- 1 . Check and adjustment of operator’s cab ………..„,.
FIELD ASSEMBLY INSPECTION REPORT
Komatsu Dozer D275A-5 D275AX-5 Field Assembly Instruction (25001 and up)
Komatsu Dozer D275A-5 D275AX-5 Field Assembly Instruction (25001 and up)