



Format: PDF
Language: EN
File Size: 15.93 MB
Pages: 249
Download PDF, Editable Content
$40.00 Original price was: $40.00.$35.00Current price is: $35.00.
CONTENTS
SPECIFICATIONS
PRECAUTIONS FOR FIELD ASSEMBLY
DISPOSAL OF REMOVED PARTS
ASSEMBLY PROCEDURE, NECESSARY EQUIPMENT, AND SCHEDULE
KIT LAYOUT DIAGRAM
STYLE FOR TRANSPORTATION
TOOLS LIST FOR FIELD ASSEMBLY
SKETCH OF TOOLS
TIGHTENING TORQUE
COATING MATERIALS
A. Assembly
M. CHECK AND MAINTENANCE PROCEDURES AFTER COMPLETION OF ASSEMBLY
APPENDIX 1. INSTALLATION OF SPILL GUARDS
APPENDIX 2. PRECAUTIONS FOR INITIALIZATION PROCEDURES FOR VHMS CONTROLLER
FIELD ASSEMBLY INSPECTION REPORT (U-DOZER SPECIFICATION)
FIELD ASSEMBLY INSPECTION REPORT (SUPERDOZER SPECIFICATION)
D 475A-5E0 D475ASD 5E0 Field Assembly Instruction (30001 and up)
D475A 5E0 D475ASD-5E0 Field Assembly Instruction (30001 and up)
GEN00051-12
SERIAL NUMBERS
D475A-
D475ASD-30001
and up