HYDRAULIC EXCAVATOR PC950 -11E0 PC950LC-11E0 Field Assembly Manual (SERIAL NUMBERS 10026 and up)
PC950 -11E0 PC950LC-11E0 Field Assembly Manual (SERIAL NUMBERS 10026 and up) Original price was: $40.00.Current price is: $35.00.
Back to products
HYDRAULIC EXCAVATOR PC400LC-6LM PC400HD-6LM AVANCE Shop Manual
PC400LC-6LM PC400HD-6LM AVANCE Shop Manual Original price was: $40.00.Current price is: $35.00.

PC5500E-6 Field Assembly Manual

HYDRAULIC EXCAVATOR PC5500E-6 Field Assembly Manual

Format: PDF

Language: EN

File Size: 20.10 MB

Pages: 518

Printable Content

Original price was: $40.00.Current price is: $35.00.

Description

HYDRAULIC EXCAVATOR PC5500E-6 Field Assembly Manual

2 SAFETY
2.1 SAFETY INFORMATION
2.2 OVERVIEW
2.3 SOUND PRESSURE LEVEL IN THE OPERATOR’S CAB.
2.4 GENERAL PRECAUTIONS COMMON TO OPERATION ON THE EXCAVATOR
2.5 PRECAUTION FOR MAINTENANCE
2.6 ADDITIONAL SAFETY INFORMATION FOR TROUBLESHOOTING AND ADJUSTMENTS
2.7 SPECIAL SAFETY EQUIPMENT
2.8 ADDITIONAL SAFETY PRECAUTIONS
3 GENERAL
3.1 GENERAL
3.2 ASSEMBLY SITE REQUIREMENTS
3.3 LIFTING OF THE MAIN COMPONENTS
3.4 GENERAL INSTALLATION PROCEDURES FOR HYDRAULIC HOSE LINES
4 ASSEMBLY SEQUENCE
4.1 ASSEMBLY SEQUENCE OF FACE SHOVEL MACHINES
4.2 ASSEMBLY SEQUENCE OF BACKHOE MACHINES
4.3 ASSEMBLY OF UNDERCARRIAGE
4.4 MOUNTING OF THE CABLE DRUM
4.5 MOUNTING OF THE CABLE GUIDE
4.6 MOUNTING SUPERSTRUCTURE PLATFORM ONTO UNDERCARRIAGE
4.7 MOUNTING OF THE MACHINERY HOUSE RAILINGS AND SAFETY RIBBONS
4.8 MOUNTING MACHINERY HOUSE ONTO THE SUPERSTRUCTURE PLATFORM
4.9 MOUNTING OF HYDRAULIC ACCESS LADDER
4.10 PRE-ASSEMBLY OF FACE SHOVEL BOOM
4.11 PRE-ASSEMBLY OF BACKHOE BOOM
4.12 MOUNTING OF COUNTERWEIGHT
4.13 ATTACHING THE HIGH VOLTAGE SWITCH CABINET
4.14 HIGH VOLTAGE INTERLOCK SAFETY SWITCHES
4.15 CONNECT HIGH VOLTAGE CABLES AND CONTROL CABLES ON MACHINES WITH CABLE DRUM
4.16 CONNECT HIGH VOLTAGE CABLES ON MACHINES WITH CABLE GUIDE
4.17 ATTACHING THE CAB BASE
4.18 ATTACHING THE CAB WITH SUPPORT FRAME TO THE CAB BASE
4.19 CONNECTING HIGH PRESSURE HOSES FROM MAIN PUMPS TO CHECK VALVES
4.20 ATTACHING INTERMEDIATE PIPE TO THE SUCTION OIL RESERVOIR
4.21 ATTACHING THE HYDRAULIC OIL RESERVOIR
4.22 ATTACHING THE HYDRAULIC OIL COOLER
4.23 CONNECTING HYDRAULIC LINES TO THE ROTARY JOINT
4.24 ATTACHING THE HANDRAILS, CATWALKS AND STEPS
4.25 ATTACHING THE CENTRAL LUBRICATION UNIT
4.26 CENTRAL REFILLING SYSTEM
4.27 ATTACHING THE SERVICE CRANE (IF SO EQUIPPED)
4.28 PRE-CHECKS PRIOR TO INITIAL START UP
4.29 HIGH VOLTAGE INTERLOCK SYSTEM
4.30 CHECKING DIRECTION OF MOTOR ROTATION
4.31 CHECK AND ADJUST ALIGNMENT OF MAIN MOTORS
4.32 FILLING AND BLEEDING THE HYDRAULIC SYSTEM
4.33 BLEEDING GEAR PUMPS FOR PTO GEAR LUBRICATION
4.34 ASSEMBLY FACE SHOVEL ATTACHMENT
4.35 BLEEDING HYDRAULIC CIRCUITS
4.36 ATTACHING FACE SHOVEL TO THE STICK
4.37 ASSEMBLY BACKHOE ATTACHMENT
4.38 BLEEDING HYDRAULIC CIRCUITS
4.39 ATTACHING BACKHOE BUCKET TO THE STICK
4.40 BLEEDING HYDRAULIC CIRCUITS OF THE TRAVEL MOTORS
5 FINAL CHECKS AND ADJUSTMENTS
5.0.1 COMMISSIONING CHECK LIST
5.0.2 ADJUSTMENT OF AUTOMATIC LUBRICATION SYSTEMS
5.0.3 MAIN PUMP ADJUSTMENT IN RELATION TO ALTITUDE AT THE MINE SITE
5.0.4 PRESSURE COMPENSATION OF SEALED COMPONENTS
5.0.5 FINAL ADJUSTMENT OF SLEW ANGLE WARNING SYSTEM
5.0.6 PLACING THE FIRE DETECTION AND SUPPRESSION SYSTEM IN SERVICE
5.1 COMMISSIONING OF THE AIR CONDITIONING
5.2 PERFORM THE PM-CLINIC ACCORDING TO THE PM-CLINIC PROCEDURE MANUAL
5.3 HANDLING OF DOCUMENTATION AFTER ASSEMBLY AND COMMISSIONING
6 ORBCOMM INITIALIZATION
6.1 ORBCOMM TERMINAL ACTIVATION
6.2 WEBCARE BASIC INFORMATION FOR MACHINE REGISTRATION
7 DISASSEMBLY OF THE MACHINE
7.1 SAFETY PRECAUTIONS FOR DISASSEMBLING THE MACHINE
7.2 GROUNDING PROCEDURE OF THE HIGH VOLTAGE SYSTEM ON MACHINES WITH CABLE DRUM
7.3 GROUNDING PROCEDURE OF THE HIGH VOLTAGE SYSTEM ON MACHINES WITH CABLE GUIDE
8 LIFTING AND TRANSPORTATION OF MAIN COMPONENTS
8.1 LIFTING OF THE MAIN COMPONENTS
8.2 TRANSPORTATION OF THE MAIN COMPONENTS