-13%
HYDRAULIC EXCAVATOR PC600-7 Shop Manual
COVER
FOREWORD
CONTENTS
SPECIFICATIONS
FIELD ASSEMBLING
ASSEMBLING PROCEDURES, APPLICABLE EQUIPMENT AND SCHEDULE
TRANSPORTATION
PACKING STYLE FOR TRANSPORTATION
LIST OF TOOLS FOR FIELD ASSEMBLING
STANDARD TIGHTENING TORQUE
A. ASSEMBLY OF BASE MACHINE
A-1. INSTALLATION OF LEFT AND RIGHT TRACK FRAMES
A-2. INSTALLATION OF TRAVEL PIPE
A-3. INSTALLATION OF TOP GUARD
A-4. INSTALLATION OF REARVIEW MIRROR
A-5. INSTALLATION OF HANDRAIL
A-6. INSTALLATION OF STEP
A-7. INSTALLATION OF LEFT SIDE STEP
A-8. STICKING SEAT TO COUNTERWEIGHT
A-9. REMOVAL OF MUFFLER TAIL PIPE
A-10. INSTALLATION OF COUNTERWEIGHT
A-11. INSTALLATION OF MUFFLER TAIL PIPE
A-12. INSTALLATION OF ORBCOMM ANTENNA (IF EQUIPPED)
A-13. INSTALLATION OF STEP LIGHT
A-14. EXTENSION OF TRACK FRAME GAUGE
A-15. INSTALLATION OF TRAVEL PIPING COVER
A-16. TESTING TRACK SHOE TENSION
A-17. INSPECTION OF OIL AMOUNT AND WATER AMOUNT
A-18. PARTS TO BE TOUCHED UP AFTER FIELD ASSEMBLY
B. ASSEMBLING OF WORK EQUIPMENT
B-1. ASSEMBLY OF BOOM FOOT PIN, BOOM CYLINDER FOOT PIN
B-2. ASSEMBLY OF BOOM ASSEMBLY
B-3. INSTALLATION OF BOOM CYLINDER FOOT
B-4. INSTALLATION OF BOOM CYLINDER HOSES
B-5. INSTALLATION OF HOSES FROM CHASSIS ALONG TOP OF BOOM
B-6. ASSEMBLY OF BOOM CYLINDER
B-7. ASSEMBLY OF ARM CYLINDER
B-8. INSTALLATION OF ARM CYLINDER HOSES
B-9. INSTALLATION OF ARM ASSEMBLY
B-10. INSTALLATION OF BUCKET CYLINDER HOSES BETWEEN BOOM AND BUCKET CYLINDER
B-11. INSTALLATION OF BUCKET
B-12. CONNECTION OF WORK EQUIPMENT GREASE PIPING
B-13. CONNECTION OF WORK EQUIPMENT WIRING
B-14. GREASING AFTER ASSEMBLING WORK EQUIPMENT
M. PROCEDURE FOR INSPECTION AND MAINTENANCE AFTER COMPLETION OF ASSEMBLY
M-1. INSPECTION OF OIL LEVEL IN HYDRAULIC TANK AND REFILL
M-2. REPLACEMENT OF RETURN FILTER (STANDARD FILTER TO FLUSHING FILTER)
M-3. FLUSHING OF HYDRAULIC CIRCUIT
FIELD ASSEMBLY INSPECTION REPORT (BACKHOE)