EC250E EC300E Operators Manual
EC250E EC300E Operators Manual Original price was: $60.00.Current price is: $50.00.
Back to products
HYDRAULIC EXCAVATOR PC2000-11R (SERIAL NUMBERS 30019 and up) Shop Manual
PC2000-11R (SERIAL NUMBERS 30019 and up) Shop Manual Original price was: $40.00.Current price is: $35.00.

PC750-7 PC750SE-7 PC750LC-7 PC800-7 PC800SE-7 Field Assembly Manual

HYDRAULIC EXCAVATOR PC750-7 PC750SE-7 PC750LC-7 PC800-7 PC800SE-7 Field Assembly Manual

Format: PDF

Language: EN

File Size: 117.46 MB

Pages: 161

Printable Content

Original price was: $40.00.Current price is: $35.00.

Description

HYDRAULIC EXCAVATOR PC750-7 PC750SE-7 PC750LC-7 PC800-7 PC800SE-7 Field Assembly Manual

PDF Dosyası: PC750-7 PC750SE-7 PC750LC-7 PC800-7 PC800SE-7 Field Assembly Manual.PDF
MAIN MENU
COVER
CONTENTS
SPECIFICATIONS
FIELD ASSEMBLING
ASSEMBLING PROCEDURES, APPLICABLE EQUIPMENT AND SCHEDULE
TRANSPORTATION
LIST OF TOOLS FOR FIELD ASSEMBLING
STANDARD TIGHTENING TORQUE
A. ASSEMBLY OF BASE MACHINE
A-1 INSTALLATION OF LEFT AND RIGHT TRACK FRAMES
A-2 INSTALLATION OF TRAVEL PIPE
A-3 INSTALLATION OF TOP GUARD
A-4 INSTALLATION OF RADIATOR COVER
A-5 INSTALLATION OF REARVIEW MIRROR
A-6 INSTALLATION OF HANDRAIL
A-7 INSTALLATION OF STEP
A-8 INSTALLATION OF LEFT SIDE STEP
A-9 INSTALLATION OF MUFFLER TAIL TUBE
A-10 STICKING OF SHEET (TO COUNTERWEIGHT)
A-11 INSTALLATION OF COUNTERWEIGHT
A-12 INSTALLATION OF ORBCOMM ANTENNA (IF EQUIPPED)
A-13 INSTALLATION OF STEP LIGHT
A-14 INSTALLATION OF TRAVEL PIPE COVER
A-15 EXTENSION OF TRACK FRAME GAUGE (ONLY WHEN 3-SPLIT PACKAGES ARE TRANSPORTED)
A-16 TESTING TRACK SHOE TENSION
A-17 INSPECTION OF OIL AMOUNT AND WATER AMOUNT
B. ASSEMBLING OF WORK EQUIPMENT OF BACKHOE
B-1 BOOM FOOT PIN, AND BOOM CYLINDER FOOT PIN
B-2 BOOM ASSEMBLY
B-3 RELIEVING REMAINING PRESSURE FROM HYDRAULIC CIRCUIT
B-4 INSTALLATION OF BOOM CYLINDER FOOT
B-5 INSTALLATION OF BOOM CYLINDER HOSE
B-6 INSTALLATION OF BOOM CYLINDER
B-7 INSTALLATION OF ARM CYLINDER
B-8 INSTALLATION OF ARM CYLINDER HOSE
B-9 INSTALLATION OF ARM ASSEMBLY
B-10 INSTALLATION OF HOSE BETWEEN BOOM AND BUCKET CYLINDER
B-11 INSTALLATION OF BUCKET ASSEMBLY
B-12 LUBRICATION PIPING TO WORK EQUIPMENT
B-13 AIR BLEEDING FROM CYLINDER
B-14 WIRING OF WORK EQUIPMENT
B-15 GREASIING AFTER ASSEMBLING WORK EQUIPMENT
C. ASSEMBLING OF WORK EQUIPMENT OF LOADING SHOVEL
C-1 RELEASING RESIDUAL PRESSURE IN HYDRAULIC CIRCUIT
C-2 PULLING OUT BOOM FOOT PIN AND BOOM CYLINDER FOOT PIN
C-3 INSTALLATION OF BOOM AND ARM ASSEMBLY
C-4 INSTALLATION OF FLUSHING PIPING BETWEEN CHASSIS AND BOOM
C-5 INSTALLATION OF FLUSHING PIPING FOR BOOM CYLINDER AND ARM CYLINDER
C-6 INSTALLATION OF FLUSHING PIPING FOR BUCKET CYLINDER
C-7 INSTALLATION OF FLUSHING PIPING FOR BOTTOM DUMP CYLINDER
C-8 INSTALLATION OF BOOM CYLINDER
C-9 INSTALLATION OF BOOM CYLINDER FOOT
C-10 INSTALLATION OF BOOM CYLINDER HOSES
C-11 INSTALLATION OF BOOM CYLINDER ROD PIN
C-12 INSTALLATION OF ARM CYLINDER HOSES
C-13 INSTALLATION OF BUCKET CYLINDER
C-14 INSTALLATION OF BUCKET CYLINDER HOSE
C-15 INSTALLATION OF CONNECTING HOSES BETWEEN CHASSIS AND BOOM TOP
C-16 INSTALLATION OF BOTTOM DUMP CYLINDER HOSES
C-17 INSTALLATION OF BUCKET ASSEMBLY
C-18 INSTALLATION OF WORKING LAMPS
C-19 INSTALLATION OF WORK EQUIPMENT GREASE PIPING
C-20 GREASING AFTER ASSEMBLING OF WORK EQUIPMENT
C-21 BLEEDING AIR FROM WORK EQUIPMENT CIRCUIT
C-22 FLUSHING OF WORK EQUIPMENT PIPING
C-23 CHECKING OIL LEVEL IN HYDRAULIC TANK AND ADDING OIL
M. PROCEDURE FOR INSPECTION AND MAINTENANCE AFTER COMPLETION OF ASSEMBLY
M-1 INSPECTION OF OIL LEVEL IN HYDRAULIC TANK AND REFILL
M-2 REPLACEMENT OF RETURN FILTER (STANDARD FILTER TO FLUSHING FILTER)
M-3 FLUSHING OF HYDRAULIC CIRCUIT
FIELD ASSEMBLY INSPECTION REPORT (BACKHOE)
FIELD ASSEMBLY INSPECTION REPORT (LOADING SHOVEL)