HYDRAULIC EXCAVATOR PC1250 -11R PC1250SP-11R Shop Manual
PC1250 -11R PC1250SP-11R Shop Manual Original price was: $40.00.Current price is: $35.00.
Back to products
HYDRAULIC EXCAVATOR PC500LC-8 Shop Manual
PC500LC-8 Shop Manual Original price was: $40.00.Current price is: $35.00.

PC5500E-6 Shop Manual

HYDRAULIC EXCAVATOR PC5500E-6 Shop Manual

Format: PDF

Language: EN

File Size: 76.82 MB

Pages: 487

Printable Content

Original price was: $40.00.Current price is: $35.00.

Description

HYDRAULIC EXCAVATOR PC5500E-6 Shop Manual

2 SAFETY
2.1 SAFETY INFORMATION
2.2 OVERVIEW
2.3 SOUND PRESSURE LEVEL IN THE OPERATOR’S CAB.
2.4 GENERAL PRECAUTIONS COMMON TO OPERATION ON THE EXCAVATOR
2.5 PRECAUTION FOR MAINTENANCE
2.6 ADDITIONAL SAFETY INFORMATION FOR TROUBLESHOOTING AND ADJUSTMENTS
2.7 SPECIAL SAFETY EQUIPMENT
2.8 ADDITIONAL SAFETY PRECAUTIONS
3 GENERAL
3.1 GENERAL
3.2 ASSEMBLY SITE REQUIREMENTS
3.3 LIFTING OF THE MAIN COMPONENTS
3.4 GENERAL INSTALLATION PROCEDURES FOR HYDRAULIC HOSE LINES
4 ASSEMBLY SEQUENCE
4.1 ASSEMBLY SEQUENCE OF FACE SHOVEL MACHINES
4.2 ASSEMBLY SEQUENCE OF BACKHOE MACHINES
4.3 ASSEMBLY OF UNDERCARRIAGE
4.4 MOUNTING SUPERSTRUCTURE PLATFORM ONTO UNDERCARRIAGE
4.5 MOUNTING MACHINERY HOUSE ONTO THE SUPERSTRUCTURE PLATFORM
4.6 MOUNTING OF HYDRAULIC ACCESS LADDER
4.7 PRE-ASSEMBLY OF FACE SHOVEL BOOM
4.8 PRE-ASSEMBLY OF BACKHOE BOOM
4.9 MOUNTING OF COUNTERWEIGHT
4.10 ATTACHING THE HIGH VOLTAGE SWITCH CABINET
4.11 ATTACHING THE CAB BASE
4.12 ATTACHING THE CAB WITH SUPPORT FRAME TO THE CAB BASE
4.13 CONNECTING HIGH PRESSURE HOSES FROM MAIN PUMPS TO CHECK VALVES
4.14 ATTACHING INTERMEDIATE PIPE TO THE SUCTION OIL RESERVOIR
4.15 ATTACHING THE HYDRAULIC OIL RESERVOIR
4.16 ATTACHING THE HYDRAULIC OIL COOLER
4.17 CONNECTING HYDRAULIC LINES TO THE ROTARY JOINT
4.18 ATTACHING THE HANDRAILS, CATWALKS AND STEPS
4.19 ATTACHING THE CENTRAL LUBRICATION UNIT
4.20 CENTRAL REFILLING SYSTEM
4.21 ATTACHING THE SERVICE CRANE (IF SO EQUIPPED)
4.22 PRE-CHECKS PRIOR TO INITIAL START UP
4.23 HIGH VOLTAGE INTERLOCK SYSTEM
4.24 CHECKING DIRECTION OF MOTOR ROTATION
4.25 CHECK AND ADJUST ALIGNMENT OF MAIN MOTORS
4.26 FILLING AND BLEEDING THE HYDRAULIC SYSTEM
4.27 BLEEDING GEAR PUMPS FOR PTO GEAR LUBRICATION
4.28 ASSEMBLY FACE SHOVEL ATTACHMENT
4.29 BLEEDING HYDRAULIC CIRCUITS
4.30 ATTACHING FACE SHOVEL TO THE STICK
4.31 ASSEMBLY BACKHOE ATTACHMENT
4.32 BLEEDING HYDRAULIC CIRCUITS
4.33 ATTACHING BACKHOE BUCKET TO THE STICK
4.34 BLEEDING HYDRAULIC CIRCUITS OF THE TRAVEL MOTORS
5 FINAL CHECKS AND ADJUSTMENTS
5.0.1 COMMISSIONING CHECK LIST
5.0.2 ADJUSTMENT OF AUTOMATIC LUBRICATION SYSTEMS
5.0.3 MAIN PUMP ADJUSTMENT IN RELATION TO ALTITUDE AT THE MINE SITE
5.0.4 PRESSURE COMPENSATION OF SEALED COMPONENTS
5.0.5 FINAL ADJUSTMENT OF SLEW ANGLE WARNING SYSTEM
5.0.6 PLACING THE FIRE DETECTION AND SUPPRESSION SYSTEM IN SERVICE
5.1 COMMISSIONING OF THE AIR CONDITIONING
5.2 PERFORM THE PM-CLINIC PROCEDURE ACCORDING TO THE PM-CLINIC PROCEDURE MANUAL
5.3 HANDLING OF DOCUMENTATION AFTER ASSEMBLY AND COMMISSIONING
6 DISASSEMBLY OF THE MACHINE
6.0.1 SAFETY PRECAUTIONS FOR DISASSEMBLING THE MACHINE
6.0.2 GROUNDING PROCEDURE OF THE HIGH VOLTAGE SYSTEM
6.0.3 DISASSEMBLY SEQUENCE OF FACE SHOVEL MACHINES
6.0.4 DISASSEMBLY SEQUENCE OF BACKHOE MACHINES
6.0.5 DISPOSAL OF WASTE MATERIAL
6.0.6 LIFTING AND TRANSPORTATION OF MAIN COMPONENTS
7 LIFTING AND TRANSPORTATION OF MAIN COMPONENTS
7.1 LIFTING OF THE MAIN COMPONENTS
7.2 TRANSPORTATION OF THE MAIN COMPONENTS